175 West 60th Street

Project Name: The Encore – Lincoln Square
Project Address: 175 West 60th St, NY
Owner: Glenwood Management
Construction Manager/General Contractor: Glenwood Management
Geotechnical Engineer: Pillori Associates
Structural Engineer: Rosenwasser/Grossman
Construction Dates (for our scope): 2012-2013

Major Technologies: Soil & Rock Excavation /Concrete Foundations / Rock Excavation / Drilled Rock Anchors / Rock Tiebacks.

Project Summary:

175 West 60th Street stands 48 stories and 533 feet tall, with 256 units in total. The building will be visually prominent on the Upper West Side’s relatively short skyline; the new Fordham-adjacent cluster will add significant density to the immediate vicinity, which has long been under-utilized.

  • CCJV’s scope consisted of Soil and Rock Excavation / Concrete Button & Underpinning SOE, Rock Tiebacks / Concrete Foundations.
  • Excavated approximately 7,000 tons of Soil and 5000cy of Rock. Installed 150 tons of Rebar and 1300cy of Concrete.